featured_0003_Craighurst Crossing Storm Outfall

Craighurst Crossing Storm Outfall

Storm outfall upgrade for Georgian Communities’ site development project in Craighurst, Oro Medonte including 33m long 3m x 2.4m concrete box culvert. Utilizing a 500 tonne crane and specialized heavy lift subcontractor to facilitate installation below active hydro wires. Also included cast in place reinforced distribution slab, hot rubberized waterproofing, retaining walls and road restoration.

featured_0004_Craighurst Crossing Pond Rehabilitation

Craighurst Crossing Pond Rehabilitation

Pond rehabilitation and retrofit of existing pond to facilitate additional storm flows from development. Including stripping and re-shaping existing pond with low flow channels, natural boulder vortex weirs, wildlife habitats, landscaping and plantings.

featured_0007_Craighurst Crossing Communal Septic

Craighurst Crossing Communal Septic

Construction of communal septic system to service 300 residential units. Included 10,000m2 tile bed, prefabricated FRP lift station installation, forcemains and specialized heavy pre-cast holding tanks required 500 tonne crane for installation.

featured_0001_Homefarm Earthworks

Homefarm Earthworks

Site Development project in Blue Mountain for Mcpherson Builders including 45,000m3 topsoil stripping, 80,000m3 cut/fill, construction of 1000m x 40m wide diversion channel complete with natural habitat measures, low flow channel, vortex weirs made of boulders sourced on-site, 66m of 2m x 3m box culvert and retaining walls. On site crushing of unearthed boulders to eliminate export of un-suitable materials.

featured_0006_Craighurst Crossing External Watermain

Craighurst Crossing External Watermain

Transmission watermain for site development project in Craighurst including 1.4km of 300mm dia. watermain along Horseshoe Valley Rd. Included 800m of directional drilling of HDPE watermain, 600m of open cut watermain in roadside ditch with air release and pressure reducing valve chambers.

featured_0000_Ninth & Maple Road Reconstruction

Ninth & Maple Road Reconstruction

Full road reconstruction and urbanization of Ninth & Maple Street in Collingwood. Included 600m of sanitary, watermain and storm sewers, services to 63 units and road construction.

featured_0008_Blue Vista Phase 1

Blue Vista Phase 1

Site Development project in Blue Mountain for Royalton Homes including tree clearing, earthworks, site servicing and road construction. 6ha tree clearing and grubbing, 20,000m3 topsoil stripping, 40,000m3 cut/fill, 2 SWM ponds, 1400m of Sanitary, Watermain & Storm Sewers. Services to 105 units. 1400m of road construction.

featured_0005_Craighurst Crossing Phase 1

Craighurst Crossing Phase 1

Site Servicing project in Craighurst, Oro Medonte for Georgian Communities including 1500m of Sanitary, Watermain & Storm Sewers. Services to 135 units. 1500m of road construction.

featured_0002_Craigleith Parkbridge

Parkbridge Craigleith

Site Development project in Craigleith, Blue Mountains for Parkbridge Lifestyle Communities including tree clearing, earthworks, bedrock blasting, site servicing, road construction. Clearing & grubbing of 20ha of trees. Stripping of 50,000m3 of topsoil. 45,000m3 of cut/fill. 95,000m3 of imported fill. 2200m of sanitary, watermain and storm sewers. 2200m of road construction. Services to 215 units. Construction of 2 SWM ponds. Construction of 3 water course crossings including by-pass pumping and installation of 60m of box culverts. Removal of 1000m3 of bedrock via blasting. On site crushing and recycling of bedrock and boulder materials.

IMG_7460

Sunnidale Trails

Site Development project in Wasaga Beach for Pacific Homes including earthworks, site servicing and road construction. 35,000m3 import, 1 SWM pond, 1 SWM drainage channel, 2800m of Sanitary, Watermain & Storm Sewers. Services to 220 units. 2800m of road construction.

DJI_0260

Minnesota Street Storm Sewer Replacement PH1

Removal and replacement of existing storm sewer infrastructure on Minnesota St for the Town of Collingwood, including installation of 220m of 1.8m x 0.9m precast concrete box culvert with cast in place distribution slab, water proofing and road reconstruction

DJI_0199

Veterans Way & Klondike Park Rd PH1

Road reconstruction/realignment and transmission watermain project for the Town of Wasaga Beach. Including tree clearing, full road reconstruction and realignment of 2km of road and 2.1km of 400mm dia watermain and street lighting.

ORILLIA - STMMHS

West Orillia Business Park

Commercial Site Development project in Orillia for The City of Orillia including earthworks, site servicing and road construction. 30,000m3 topsoil stripping, 150,000m3 cut/fill, 600m of Sanitary, Watermain & Storm Sewers to service 17 commercial lots. 900m of road construction.

COUNTY RD 42

County Rd 42 Transmission Watermain

Transmission watermain project for Clearview Township including 4km of 600mm dia. Watermain installed by a combination of open cut, directional drill and jack and bore.

3 BOX CULVERT

Culvert 11 Replacement

Replacement of Culvert 11 for Township of Oro Medonte including 18m long 4.9m x 2.3m pre-cast concrete open bottom box culvert, utilizing a 500 tonne. Also included cast in place reinforced distribution slab, hot rubberized waterproofing, retaining walls and road restoration.

20190916_174603

Zoo Park Rd Drainage Improvements PH1

Upgrading storm drainage for the Town of Wasaga Beach including 210m of 1.8m x 0.9m precast concrete box culvert and road restoration.

SEASONS ON LITTLE LAKE

Seasons on Little Lake

Site Development project in Midland for Hanson Group including tree clearing, earthworks, site servicing and road construction. 10ha tree clearing and grubbing, 40,000m3 topsoil stripping, 80,000m3 cut/fill, 2 SWM ponds, 1500m of Sanitary, Watermain & Storm Sewers. Services to 150 units. 1500m of road construction. Jack and bore installation of watermain under Hwy 12.